Feasibility Study – August 2024
Atkins Réalis produced this set of architectural designs for our plans to improve the building.
Roof Conditions – April 2024
This was a surveyof the building’s general building fabric with advice for rectifications, potential energy performance upgrades a high-level cost estimate for repairs and energy performance upgrades.
Cost Estimates – May 2024
These high level cost estimates from Atkins Réalis allow us to quantify some of the potential maintenance costs ahead.
Asbestos Report – August 2024
Perry Analytical provided this report following a survey in June 2024.
Topographical Survey – May 2024
A topographical survey by 1st Horizon.
Annexe Roof – April 2024
Report about conditions of the annexe roof produced by HOP Consulting.
Structural Calcs – April 2024
Calculations and Drawings from HOP Consulting
EPC Report – October 2023
Condition of heating and energy in the building.
Conditions Survey – July 2022
The initial conditions survey for the building.