Building

Key Reports

We are sharing access to these reports about our building for funders / partners to review.
Please contact us for more detail.

Feasibility Study – August 2024

Atkins Réalis produced this set of architectural designs for our plans to improve the building.

Roof Conditions – April 2024

This was a surveyof the building’s general building fabric with advice for rectifications, potential energy performance upgrades a high-level cost estimate for repairs and energy performance upgrades.

Cost Estimates – May 2024

These high level cost estimates from Atkins Réalis allow us to quantify some of the potential maintenance costs ahead.

Asbestos Report – August 2024

Perry Analytical provided this report following a survey in June 2024.

Topographical Survey – May 2024

A topographical survey by 1st Horizon.

Annexe Roof – April 2024

Report about conditions of the annexe roof produced by HOP Consulting.

Structural Calcs – April 2024

Calculations and Drawings from HOP Consulting

EPC Report – October 2023

Condition of heating and energy in the building.

Conditions Survey – July 2022

The initial conditions survey for the building.